Rigging Safety Compliance Checklist
Project/Job Site Name
Inspector Name
Inspection Date
Equipment Inspection
Has the crane/hoist been inspected and certified within required timeframes?
Yes
No
Has load weight been verified and is within equipment capacity limits?
Yes
No
Are all rigging hardware components (slings, shackles, hooks) in good condition?
Yes
No
Environmental & Site Conditions
Are weather conditions suitable for lifting operations (wind speed, visibility)?
Yes
No
Are ground conditions stable and suitable for equipment setup?
Yes
No
Is the swing radius clear of personnel, structures, and obstacles?
Yes
No
Personnel & Training
Are all personnel properly trained and certified for their roles?
Yes
No
Is a qualified signal person assigned and positioned appropriately?
Yes
No
Are communication systems tested and functioning properly?
Yes
No
Pre-Lift Procedures
Have load attachment points been inspected and verified as adequate?
Yes
No
Have emergency procedures been reviewed with all personnel?
Yes
No
Has a pre-lift safety meeting been conducted with all involved personnel?
Yes
No
Additional Notes or Observations
Generate Safety Report